A process that requires a mixture of both - steps to be dispatched to nodes and steps to be executed on the rundeck node.
I'd like to be able to have a step that executes another job and passes the node to the job id that is currently been executed.
This way there can be a mix of executing on the node, but also executing on the rundeck node using the former node as a value.